In the context of growing industrialization and modernization, the demand for lifting equipment such as lift tables is increasing. Naltako, as one of the leading providers of lifting solutions, has been constantly improving its workflow to bring customers the best products and services. This article will delve into Naltako’s delivery process for a lift table in Hung Long, Bac Giang, from receiving the request to completing the installation.
The delivery process of a 4-ton lift table in Hung Long
Receiving orders
The first and most important step in the delivery process is receiving the customer’s request. Naltako’s consulting team will listen carefully to the specific requirements of the customer, including information on load capacity, dimensions, working environment, as well as other special requirements for the lift table. Through direct or online exchange, Naltako will grasp all customer needs.
Site survey
After receiving the request, Naltako’s technical team will conduct a direct survey at the site. This survey aims to:
- Evaluate working conditions: Measure the installation space dimensions, floor flatness, power source, and factors affecting the operation process.
- Determine the optimal installation location: Find the most suitable installation position to ensure work efficiency and safety for users.
- Solution consulting: Based on the survey results, the technical team will advise the customer on choosing the most suitable lift table and provide solutions to optimize work performance.
Quotation
Based on the survey and customer requirements, Naltako will prepare a detailed quotation. The quotation will include:
- Product cost: Depending on the type of lift table, load capacity, dimensions, and additional features.
- Shipping and installation costs: Including the cost of transporting the lift table to the site, labor costs for installation, and other incurred costs.
- Execution time: Estimated time from signing the contract to completing the installation.
- Warranty policy: Warranty period and terms.
Assembly
After the customer agrees and signs the contract, Naltako will proceed with production and transport the lift table to the site. Our experienced technical team will assemble the lift table according to technical procedures, ensuring accuracy and safety. The assembly process includes the following stages:
- Site preparation: Cleaning and leveling the installation area.
- Parts assembly: Assembling the parts of the lift table according to the technical drawings.
- Inspection and calibration: Carefully checking joints, electrical systems, and hydraulics to ensure stable operation.
- Operational testing: Performing load lifting tests to check the lift table’s operational capability.
Completion



After completing the assembly process, Naltako will hand over the lift table to the customer. We will guide the customer on how to use and maintain the lift table safely and effectively. At the same time, Naltako will provide all technical documents, warranty books, etc.
Conclusion
The delivery process of the 4-ton lift table in Hung Long by Naltako is carried out professionally, ensuring the highest level of customer satisfaction. With an experienced team, modern production systems, and dedicated customer service, Naltako is always the top choice for customers in need of lifting equipment.

Tiếng Việt
Handing over mini cranes in Hung Ha
Handing over the 500kg cargo lift in Hai Phong
Handing over the cargo lift in Thach That
Forklift ramp handover in Bac Giang – Naltako
HANDOVER OF 10T MOBILE YARD RAMP AT VINFAST HAI PHONG – NALTAKO
HANDOVER OF 10-TON FORKLIFT RAMP IN BAC GIANG – NALTAKO
Handing over 6-ton capacity forklift container ramp in Bac Ninh – NALTAKO
Naltako Hydraulic Lift Table Catalog