To optimize the speed and efficiency of the goods import and export process, the dock leveler has become an indispensable solution. Recently, Naltako is extremely proud to have completed its largest super project ever, installing 96 sets of docks at Dinh Vu Industrial Park, Hai Phong. This is an important step forward, affirming Naltako’s outstanding capability in providing comprehensive logistics solutions, meeting the strictest requirements from customers.
Installation implementation at Dinh Vu Industrial Park
The project of installing 96 dock leveler sets at Dinh Vu IP was a major challenge, requiring the smooth and professional coordination of the entire team.
Professional technical team

Under the close supervision of the project management board, Naltako’s skilled engineers and workers worked tirelessly. With extensive experience and high craftsmanship, they executed each stage meticulously, from site preparation and steel frame installation to the calibration of hydraulic and electrical systems.
Scientific workflow

Every stage complied with strict labor safety and technical standards. The use of specialized equipment and the application of a scientific workflow helped the project proceed on schedule, ensuring absolute quality and safety.
Completion and handover of dock levelers to the customer
After 1 month of effort, all 96 dock leveler sets have been completed and put into operation.
- Inspection and load testing: Before handover, each dock leveler set was strictly inspected and load-tested. All parameters regarding durability, stability, load-bearing capacity, and safety features must meet standards before being handed over to the customer.
- Operation guidance: The Naltako team enthusiastically provided detailed instructions to the customer’s staff on operation, maintenance, and handling of arising situations, ensuring they can effectively master the equipment.
- Positive feedback: The completion of the project has received absolute satisfaction from the customer. The 96 dock leveler sets have operated smoothly, helping to optimize the goods import-export process, shorten loading/unloading time, and improve the overall productivity of the warehouse.
>>> Naltako hands over dock leveler combined with forklift ramp
Conclusion
The project where Naltako completed the dock leveler super project at Dinh Vu IP is an important milestone, affirming Naltako’s capability and leading position in the field of providing logistics solutions. With professionalism, dedication, and commitment to quality, Naltako is confident in being a reliable partner, accompanying the sustainable development of businesses nationwide.

Tiếng Việt
Naltako hands over 5 mini cranes in Hung Yen
Naltako Hands Over 4-Ton Hydraulic Lift Table in Thai Binh
Naltako Hands Over Freight Elevator at Core 5 Hung Yen
Naltako hands over dock leveler combined with forklift ramp
Naltako hands over 2 forklift ramps in Nghe An
Naltako Hands Over Mini Cranes in Ho Chi Minh City
Naltako hands over personnel lift at Hyundai Hillstate.
Naltako Completes & Dispatches Forklift Ramps

